Mechanical Equipment Coordination and Operation Mode of Wuhan-Guangzhou Passenger Dedicated Line Large Cross-section Tunnel Construction

  studies were carried out to determine the principles of mechanical equipment coordination for large cross-section tunnel construction in combination with the tunnel construction practices within the sections under the charge of China Railway First Group Co.,Ltd.on Wuhan-Guangzhou PDL and with a view to optimize the allocation of resources and improve the efficiency of large cross-section tunnel construction.Directed to different procedures such as excavation,support,waterproofing,drainage and lining,the mechanical equipment coordination and operation mode of large cross-section tunnels on the passenger dedicated line were established and the mechanized working faces were formed,which provide experience and reference for the large cross-section tunnel construction of passenger dedicated lines.

large cross-section tunnel mechanical equipment coordination operation mode

Zhimin Xiang Renai Yuan

College of Civil Engineering and Architecture, Central South University China Railway First Group Co., Ltd

国际会议

the 2011 International Conference on Biotechnology, Chemical and Materials Engineering (2011生物,化学与材料工程国际会议(CBCME 2011))

昆明

英文

166-169

2011-12-28(万方平台首次上网日期,不代表论文的发表时间)