会议专题

Application Research on TorkBuster in Well Yashen 1 of Yumen Oilfield

  To the technical difficulties of slow ROP and low drilling efficiency in Silurian formation of Yumen Oilfield.After investigating on the ROP improvement technologies of domestic and abroad similar formations characteristics,proposing a drilling test program of torsion and percussion in Silurian formation of Well Yashen 1.The test well section is 3753.00~4108.05m,the accumulative footage of TorkBuster is 355.05m,the actually drilling time is 208.35h,the average ROP is 1.70rn/h.Compared with the offset well,the average ROP is up to 110%.The test results are shown that:TorkBuster eliminates the stick-slip phenomenon effectively when the bit cutting the formation,ensures the PDC bit continue to cut the formation effectively,cuts down the drilling cycle and saves the drilling cost.It provides a new guiding ideology to increase ROP in Cretaceous formation ofYumen Oilfield.

Silurian Formation ROP TorkBuster PDC Bit Cretaceous Formation

Yi Gen Zeng Zhong Liang Wei Da Hong Liu

College of Petroleum Engineering,Changzhou University,Changzhou,Jiangsu,213016,China Beijing Hainan Huaxuan Science and Technology Co.,Ltd.,Beijing,100071,China

国际会议

the 2012 International Conference on Manufacturing Engineering and Automation (2012年制造工程与自动化国际会议(ICMEA2012))

广州

英文

484-487

2012-11-16(万方平台首次上网日期,不代表论文的发表时间)