Testing Technology of Subsea Christmas Tree

  As an important part of the deep-water oil and gas field,the development process of subsea Christmas tree includes design,manufacture and test.The testing technology of subsea Christmas tree supplies reliability and security for the use of subsea Christmas tree,and its an important content of the localization of subsea Christmas tree.This paper takes Zhuhai deep water subsea engineering equipment manufacturing and testing base as the basis,in accordance with relevant specifications and engineering examples,mainly studies the factory acceptance testing and the system integration testing of subsea Christmas tree and puts forward the content and steps of the testing.Meanwhile,the site requirements are analysed which will provide technical support for the subsea Christmas tree testing research and provide references and recommendations for the establishment of Zhuhai base in China.

Subsea Christmas Tree Factory Acceptance Testing System Integration Testing Zhuhai Base

Bao Yan Chen Meng Lan Duan Ming Zeng Shi Chao Lu Zhuo Liu Tong He Ming Jie Li

Offshore/Oil Gas Research Center,China University of Petroleum,Beijing 102249,China Dept.of Mechanics and Engineering Science,Fudan University,Shanghai 200433,China

国际会议

the 2012 International Conference on Manufacturing Engineering and Automation (2012年制造工程与自动化国际会议(ICMEA2012))

广州

英文

2523-2526

2012-11-16(万方平台首次上网日期,不代表论文的发表时间)