会议专题

The Research of Electro-hydraulic Proportional Control on Copper Anode Lifting Platform

  This paper introduces the structure and working principle of the designed copper anode lifting platform.According to the actual working conditions and the structure of the lifting device,hydraulic system of electro-hydraulic proportional synchronous lifting device is designed and its working principle is analyzed.This paper takes the electro-hydraulic synchronization system as a research subject,whose mathematic model is established.To solve the synchronization accuracy of the hydraulic cylinder movement in the lifting process,a model reference adaptive controller is designed which is based on hyperstability theory.Both system simulation models of traditional PID control and adaptive control are established respectively in the software of Matlab/Simulink.Through the simulation result we can learn that adaptive control is batter than the PID control.Two hydrauliccylinders synchronization error is less than 0.02mm.

lifting platform synchronization lifting hyperstability theory adaptive control

Zhi-fei Peng Rui-bo Yuan Jing Luo Rong Li

Institute of Optical Hydromechatronics System Integration and Control Engineering,Faculty of Mechanical and Electrical Engineering,Kunming University of Science and Technology,Kunming 650093,China

国际会议

the 16th International Conference on Fluid Dynamic and Mechanical & Electrical Control Engineering (第16届流体动力与机电控制工程国际学术会议 (FDMECE2012))

重庆

英文

172-176

2012-11-10(万方平台首次上网日期,不代表论文的发表时间)