Development of Runner Castable for Small and Medium-Size Blast Furnace
In this work,a new kind of Al2O3-SiC-C castables was developed.There are no asphalt and resin in the developed castables,and there are no toxic gases generated and no environmental pollution during the application.After the installation,only 3-5h is needed for castable to dry out.This process is more energy-saving and more environment-friendly compared to the traditional castables.The service life of the new castable is as good as that of the traditional castables.
LIU Yongfeng WANG Bingjun LIU Kaiqi DING Yu ZHAO Hongwei LUO Zhiyong
Beijing Key Laboratory of advanced ceramic and refractories, China Iron and Steel Research Institute Group, Beijing, China
国际会议
The 6th International Symposium on Refractories (第六届国际耐火材料会议)
郑州
英文
150-152
2012-10-18(万方平台首次上网日期,不代表论文的发表时间)