会议专题

Numerical Simulation of Excavation of Abutment Slope at Left Bank in Dagangshan Hydropower Station

  The abutment slope at left bank in Dagangshan hydropower station has complex geological conditions with deep fractures,developed faults and unloading crack.The excavation will influence the stability of the slope.To evaluate the slope stability,the finite element model of this abutment slope was built in this paper to study the deformation,stress and plastic zone distribution of the slope during the excavation.The potential failure location of the slope is forecasted,some suggestions are proposed to be helpful to keep the stability of the slope.

Dagangshan hydropower station abutment slope numerical simulation excavation

Kun Yang Zhichao Ma Hao Han

Key Laboratory Mining Disaster Prevention and Control, Ministry of Education, Shandong University of Science and Technology, Qingdao, China

国际会议

The International Conference on Civil Engineering, Architecture and Sustainable Infrastructure (2012土木建筑与可持续基础设施工程国际会议(ICCEASI2012))

郑州

英文

313-316

2012-09-22(万方平台首次上网日期,不代表论文的发表时间)