会议专题

Thermal Stress Analysis of Large Scale U-Shaped Aqueduct

  The aqueduct is one of large scale water conservancy project across fiver,which is the first level of anti-cracking structure with rigorous control of cracks.At present,the thermal analysis of aqueduct structure most borrows ideas from box-girder bridge structure without considering their difference.As the thermal stress of large-scale concrete structure during construction and operational process is redoubtable,the U-shaped model of a practical aqueduct of South-to-North Water Diversion is established to do the steady and transient thermal analyses.The result shows that the structure of U-shaped aqueduct is reasonable,it is not necessary to take special measures to control the temperature during the construction and operational process.

U-shaped aqueduct thermal stress steady thermal transient thermal

Jianhua Zhang

North China University of Water Resources and Electric Power, Zhengzhou 450011, China

国际会议

The International Conference on Civil Engineering, Architecture and Sustainable Infrastructure (2012土木建筑与可持续基础设施工程国际会议(ICCEASI2012))

郑州

英文

325-328

2012-09-22(万方平台首次上网日期,不代表论文的发表时间)