会议专题

Full-scale Model Test for Anchorage Zone of Pylon of Cable-stayed Bridge

  In this paper,the construction technology for main pylon of cable-stayed bridge is researched through test of full-scale model of anchorage zone of pylon of Guangzhou Bridge.Stress distribution and deformation condition of model under prestressed tendons and cable force are analyzed.Numerical simulation on this anchorage zone model is carried out.By comparing FEM results to the test results,some important conclusions are drawn out and give some advices to the optimum design of the bridge pylon.Parts of the achievements have been applied to actual bridge work and obtained successful engineering experience.

cable-stayed bridge full-scale model test anchorage zone of pylon numerical simulation

Xiaolin Yu Buyu Jia Weifeng Wang Quansheng Yan

School of Civil Engineering and Transportation, South China University of Technology, Guangzhou 510640, China

国际会议

The International Conference on Civil Engineering, Architecture and Sustainable Infrastructure (2012土木建筑与可持续基础设施工程国际会议(ICCEASI2012))

郑州

英文

728-732

2012-09-22(万方平台首次上网日期,不代表论文的发表时间)