Monitoring Analysis on Tunnel Portal Shallow Burying Segment of Center Diaphragm Construction Method

  Combined with highway tunnel monitoring measurement work of Bijia Mountain,the contents and methods of site monitoring and the analyzing methods for collected data of highway tunnel construction were studied.A comparative way was used to analyze the different curves of displacement with time on the two typical segments of ground settlement convergence and vault crown settlement.The result shows that the site monitoring curves of displacement with time can be divided into normal type and abnormal one.This article puts forward some feasible suggestions about how to guide the safe construction through the two types of curve.The aim of this article is to explore the changing of the abnormal curve before the dangerous accident occur,and give the causes of the reasonable analysis after collapse happened.

shallow burying segment tunnel engineering site monitoring data analysis guide the safe construction

Fei Zhou Yongli Xie Jinxing Lai

School of Highway, Changan University, Xian 710064, China

国际会议

The International Conference on Civil Engineering, Architecture and Sustainable Infrastructure (2012土木建筑与可持续基础设施工程国际会议(ICCEASI2012))

郑州

英文

808-813

2012-09-22(万方平台首次上网日期,不代表论文的发表时间)