会议专题

Energy saving and payback period for retrofitting air conditioning systems in Taiwan

  In Taiwan,AC systems in buildings with central air conditioning account for over 45% of the total electricity consumed.Inefficient and poorly designed AC systems in existing buildings waste considerable amounts of money and energy.Therefore,retrofitting AC systems has become a widely adopted strategy to save energy while maintaining a comfortable indoor thermal environment.This study analyzes the potential energy savings and payback period of retrofitting AC systems in public buildings.In addition to the required Building Energy Management System (BEMS),several measures are introduced to reduce energy consumption during retrofitting.The main measures include testing,adjusting,and balancing (TAB) of existing AC systems; replacing over-designed chillers with chillers with smaller capacity; installing frequency conversion in original systems,such that they become variable water volume (VWV) and variable air volume (VAV) systems; and utilizing CO2 concentration control and pre-cooling air systems.Based on analytical results,we conclude that AC system retrofitting can reduce total energy usage by 11.75%,while the average payback period for a retrofit project is 4.71 years,demonstrating that AC system retrofitting in Taiwan is economically sound.

AC systems retrofit Energy saving Payback period

Chung-Yi Chang Hsien-Te Lin Chun-Ta Tzeng Kuan-Hsiung Yang Yew-Khoy Chuah Ming-Chin Ho

Department of Architecture, NCKU, Taiwan Department of Mechanical and Electro-Mechanical Engineering, NSYSU, Taiwan Department of Energy and Refrigerating Air-Conditioning Engineering, NTUT, Taiwan Director General, Architecture and Building Research Institute, Ministry of the Interior, Taiwan

国际会议

the Second International Conference on Frontiers of Manufacturing and Design Science(第二届制造与设计科学国际会议(ICFMD 2011))

台湾

英文

2850-2854

2011-12-11(万方平台首次上网日期,不代表论文的发表时间)