会议专题

Using Computer Software to Simulate AC Interference and Mitigation Measures of Buried Pipeline

  Due to rapid development of HVAC transmission lines,AC electric railways and oil and gas pipelines,these lines will inevitably cross or lie parallel to each other.At these position pipelines will be subject to serious interferences.In most situations,only the results of an interference are detectable,with no clue as to what caused the problem.This paper presents a new method designed to solve AC interference.When the interference source cannot be determined,AC voltages of buried pipelines are first measured and the AC interference is simulated.Furthermore,a mitigation method is built using computer software.After mitigation devices are installed on the pipeline,AC voltages are simulated once more and compared with field-measured values.The result shows that the simulated AC interference and the subsequent mitigation method built with computer software are more efficient.

Pipeline HVAC transmission line AC Interference Simulation Mitigation

Jun Zhao Guangji Shen Xudong Yin Zhenhua Chen Zhiyuan Xue Hongyuan Chen Weibin Wang Shaopeng Yu Lei Su

Engineer, Petrochina Pipeline R&D Center, No.51 Jinguang Road, Guanyang District, Langfang, Hebei 06 Assistant Engineer, Petrochina Pipeline R&D Center, No.51 Jinguang Road, Guanyang Distinct, Langfang Engineer, Petrochina West-East Gas Pipeline Company, Tongsheng Building, No.458, Fushan Road, Pudong Assistant Engineer, Petrochina Pipeline R&D Center, No.51 Jinguang Road, Guanyang District, Langfang Senior Engineer, Petrochina Pipeline R&D Center, No.51 Jinguang Road, Guanyang District, Langfang, H Engineer, Petrochina Pipeline Company, No. 408, Xinkai Road, Guanyang District, Langfang, Hebei 0650 Assistant Engineer, Zhongyuan Oil & Gas Transportation Sub-Company of Petrochina Pipeline Company, N

国际会议

第四十届国际海事委员会会议

北京

英文

161-170

2012-10-14(万方平台首次上网日期,不代表论文的发表时间)