Failure Analysis on Pipe Body Fracture of S135 Drill Pipe in West-East Gas Pipeline for Direction Crossing
The S135 drill pipe occurred failure accident for direction crossing rive during West-East natural gas transmission In order to analyze the failure reason,this paper carries on the overall analysis to the drill pipe sample based on the magnetic particle testing,fractography,and metallography,et.al.The analysis discovers that: the fracture has many cycle cracks and the sulfur content in the lateral fracture is higher than that in the other area of the drill pipe.The cracks show the typical characteristic of hydrogen sulfide stress corrosion cracking.It concludes that the fractures are hydrogen sulfide stress corrosion cracking.The drill pipe with anti-hydrogen sulfide property should be used and the drill pipe should be stored for a period before using in this oil field.
Traversing Drill Pipe Hydrogen Sulfide Stress Corrosion Crack Fracture
Jianjun Wang Yaorong Feng Xiangzhen Yan Hanxiu Peng Zhiyong Luan
Engineer, CNPC Tubular Goods Research Institute, Xian 710065, Shanxi, China;Doctor, College of Mech Professor, CNPC Tubular Goods Research Institute, Xian 710065, Shanxi, China Professor, College of Pipeline and Civil Engineering, China University of Petroleum, Dongying 257061 Engineer, SINOPEC Research Institute of Petroleum Engineering, Beijigng 100101, China Engineer, Oil Production Research Institute, Shengli Oilfield Branch Company, SINOPEC, Dongying 2570
国际会议
北京
英文
229-237
2012-10-14(万方平台首次上网日期,不代表论文的发表时间)