Discussion on Control Methods of Geological Hazard Induced by Long-Distance Pipeline Construction

  With construction of long-distance pipeline in the complex geological mountain area in China,the urgent problem of how to control geological hazards induced by construction has arisen.This paper takes China-Myanmar Oil and Gas Pipeline Project construction as an example.The sweeping lines of pipeline construction,the approach of construction machinery,pipe trench excavation and construction,and the different working conditions are analyzed.Finally,the control methods are proposed for construction induced landslides,debris flow,rock fall and other typical geological disasters.The treatments are verified by the actual project with positive effects.

Long-distance pipeline Construction Geological hazard Control methods

Shuhuai Mu Jianfeng Gao Jinhong Huo ChengLei,Wang Conggang Jiang

Senior engineer, China Petroleum Pipeline Engineering Corporation, No.146,Heping Road, Langfang 0650 Engineer, China Petroleum Pipeline Engineering Corporation, No.146,Heping Road, Langfang 065000

国际会议

第四十届国际海事委员会会议

北京

英文

327-342

2012-10-14(万方平台首次上网日期,不代表论文的发表时间)