The Study of Closed-loop Management in Pipeline Integrity
Combining a six-step cycle integrity management mode in PetroChina Pipeline company with an integrity management program,this paper sorts out the business relationship of pipeline integrity management and achieves the design scheme of closed-loop management.The design scheme fixed in the Pipeline Integrity Management System (PIS) by information means realizes the integrity of business standardization and information management.
Closed-loop Management Six-step Cycle Integrity Management Program
Baolong Yang Lijian Zhou Wenchao Han Feijun Shen Yang Liu
Engineer, Integrity Institute, Petrochina Pipeline R&D Center; No.51, Jinguang Road, Langfang 065000 Senior Engineer, Integrity Institute, Petrochina Pipeline R&D Center; No.51, Jinguang Road, Langfang Assistant Engineer, Integrity Institute, Petrochina Pipeline R&D Center; No.51, Jinguang Road, Langf Assistant Engineer, Petrochina Pipeline HuaZhong Gas Transportation Sub-company; No.977, Xiongchu St
国际会议
北京
英文
540-647
2012-10-14(万方平台首次上网日期,不代表论文的发表时间)