会议专题

Study on the Key Techniques and Safeguards of the Municipal Water Supply Pipes Constructions in Rocks along the Upper Reaches of Yangtze River

  Taking Yuelai Waterworks with the daily water supply capacity 600,000 tons in Chongqing as an example,this study focuses on the characteristics and difficulties of municipal water intake constructions in rock along the upper reaches of Yangtze River.The key techniques of blasting engineering with the large diameter (2×14000mm),large geological depth (50m) of water pipeline constructions are described.The result shows that the smooth blasting technology can be applied to control the blasting contour precisely,the best blasting effect can be achieved through optimizing the blasting parameters,and the field precise leveling monitoring and information feedback can be successfully applied to guarantee the project quality and safety.Meanwhile,this demonstration project provides valuable experience and technical guidance for the future large diameter,large geological depth of water pipeline construction in rock.

Upper Reaches of Yangtze River Rocky locations Large diameter and large geological depth water supply pipes Blasting engineering techniques Characteristics and difficulties Safeguards

Xiaoling Lei Kang Yang Haiyan Wang Yubo Liu

Professor, Chongqing Academy of Science and Technology(CAST); No.2, Yangliu Road, Huangshan Avenue, Chongqing Jiaotong University, No.66, Xuefu Avenue, Nan’an District, Chongqing, China 400074 Sino French Water Development(MACAU)Co. Ltd

国际会议

第四十届国际海事委员会会议

北京

英文

1144-1150

2012-10-14(万方平台首次上网日期,不代表论文的发表时间)