会议专题

Application of Deep Pit in Horizontal Directional Drilling Crossing Design of Retaining and Protecting for Pit Excavation with Depth of 19m under Coarse Sand and its Construction

  When the length of crossing is limited,two times of directional drilling crossing will be adopted.To excavate pit for connection of pipes can be yet regarded as a good solution in case that there are two times of directional drilling crossing.This paper is going to talk about the crossing of Weihe River in the second West-to-East project and introduce the design of retaining and protecting for pit excavation with depth of 19m under coarse sand as well as its construction,which provide reference and knowledge to apply pit to directional drilling crossing project as connection.

Directional Drilling Splice Pit Retaining and Protecting for Pit Excavation

Wei Yang Guohui Li Hongxin Ma

Wei Yang, Crossing Engineer; China Petroleum Pipeline Engineering Corporation; No.146, Heping Road, Guohui Li, Crossing Engineer, Director of Crossing Department; China Petroleum Pipeline Engineering Hongxin Ma, Crossing Engineer; China Petroleum Pipeline Engineering Corporation; No.146, Heping Road

国际会议

第四十届国际海事委员会会议

北京

英文

1806-1815

2012-10-14(万方平台首次上网日期,不代表论文的发表时间)