Application of Deep Pit in Horizontal Directional Drilling Crossing Design of Retaining and Protecting for Pit Excavation with Depth of 19m under Coarse Sand and its Construction
When the length of crossing is limited,two times of directional drilling crossing will be adopted.To excavate pit for connection of pipes can be yet regarded as a good solution in case that there are two times of directional drilling crossing.This paper is going to talk about the crossing of Weihe River in the second West-to-East project and introduce the design of retaining and protecting for pit excavation with depth of 19m under coarse sand as well as its construction,which provide reference and knowledge to apply pit to directional drilling crossing project as connection.
Directional Drilling Splice Pit Retaining and Protecting for Pit Excavation
Wei Yang Guohui Li Hongxin Ma
Wei Yang, Crossing Engineer; China Petroleum Pipeline Engineering Corporation; No.146, Heping Road, Guohui Li, Crossing Engineer, Director of Crossing Department; China Petroleum Pipeline Engineering Hongxin Ma, Crossing Engineer; China Petroleum Pipeline Engineering Corporation; No.146, Heping Road
国际会议
北京
英文
1806-1815
2012-10-14(万方平台首次上网日期,不代表论文的发表时间)