Integral Inference Method of Incomplete Reliability Information With Reliability Growth Model Under Delayed Fix Mode
In order to solve the reliability estimation with incomplete reliability information in different development stages of products,an integral inference method is given in this paper.By using the maximum likelihood method,the log-likelihood function for the type-I censored and grouped data is established.The point estimation of parameters and the covariance between them are also obtained.At last,a lot of Monte Carlo simulation is adopted to prove the method given in this paper is better than the traditional method.Because the method given in this paper can make the reliability data in different stages an integral for statistical analysis,it can reach higher precision than the traditional method.
integral inference reliability growth model delayed fix mode
Ao Liang Qihua Wang Xin Wang
China Aero-Polytechnology Establishment Beijing, China
国际会议
成都
英文
344-346
2012-06-15(万方平台首次上网日期,不代表论文的发表时间)