会议专题

Optimal Preventive Maintenance Interval and Spare Parts Number in A Rolling Stock System

  In this paper,we deal with a preventive maintenance (PM) scheduling and spare parts problems for a rolling stock system.We determine the optimal PM interval and the optimal number of spare parts for components in the rolling stock system to minimize the system life cycle cost during satisfying the system target availability.The system availability and system life cycle cost are estimated by simulation.A genetic algorithm and a simulated annealing are proposed to find the optimal PM intervals and the optimal spare parts number of all components.Numerical examples are also studied.

rolling stock preventive maintenance spare parts RAM simulation

Won Young Yun Young Jin Han Goeun Park

Department of Industrial Engineering Pusan National University Busan, 609-735, Korea

国际会议

2012 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering & The 3rd International Conference on Maintenance Engineering (2012质量,可靠性,风险,维修性及安全性工程国际会议(QR2MSE 2012 & ICME 2012))

成都

英文

373-377

2012-06-15(万方平台首次上网日期,不代表论文的发表时间)