会议专题

Optimizing Spare Inventory Under Group Maintenance Policy

  A simulation model for joint optimization of GM and spare part inventory control under infinite horizon is presented through analyzing the characteristic of spare part demand of a system under group maintenance (GM) policy.In this model,maintenance activities of GM and spare supply are simulated using Monte Carlo method,by which costs of repair,spare inventory,and loss of system downtime induced by lack of spare are calculated.Then,expected total cost per unit time can be obtained by simulating for a number of periods.The preventive replacement interval and the stock level are optimized by minimizing the total cost per unit time.Matlab is utilized to gain the numerical solution of the model,and a sensitivity analysis of model has been done.

block replacement spare part inventory simulation optimization

Chang-An Xu Jianmin Zhao Ya Li

Department of Management Mechanical Engineering College Shijiazhuang, China

国际会议

2012 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering & The 3rd International Conference on Maintenance Engineering (2012质量,可靠性,风险,维修性及安全性工程国际会议(QR2MSE 2012 & ICME 2012))

成都

英文

465-468

2012-06-15(万方平台首次上网日期,不代表论文的发表时间)