Study on Extraction Technology of Undulated Steeply Pitching Coal Seam
In order to study the extraction technology of undulated steeply pitching coal seam, the roadway lay - out and mining technology parameters are researched in detail at the basis of analysis the necessity of mining steeply pitching coal seam.The roadway lay — out and extraction technology parameters of undulated steeply pitching coal seam are put forward.The roadway lay - out is slope and the extraction technology parameters are bench blasting technology and ladder blasting technology by the occurrences traits of undulated steeply pitching coal seam and the production and practice in DaAnShan colliery.The optimization technology is ascertained to be two high benches by analysis the advantages and disadvantages of the two extraction technologies and the effectiveness of industrial scale experiment underground.So, the yield, recovery, work efficiency and safety are improved.
undulated steeply pitching coal seam flexible shield supports mining roadway lay -out extraction technology ladder flexible shield supports mining
Wang Lei Lu Guobin Huo Bingjie Zhang Maolin
College of Safety Science and Engineering,Liaoning Technical University,Fuxin,123000,China College of Mining Engineering,Liaoning Technical University,Fuxin,123000,China Beijing HaoHua energy Co. Ltd. ,Beijing,102300,China
国际会议
the 4th International Symposium on Mine Safety (2012) 第四届国际矿山安全学术研讨会(2012)
阜新
英文
571-574
2012-08-04(万方平台首次上网日期,不代表论文的发表时间)