Reconfigurable Assembly Approach for Wind Turbines Using Multiple Intelligent Agents
This paper investigates the use of an agent based assembly strategy for a wind turbine hub. The manual assembly procedure for a wind turbine is presented. The hub parts are constantly optimised and therefore a fully automated assembly line requires continously reprogramming. Thus, a new reconfigurable assembly system is introduced which is flexible and selfadaptive. The methodology of implementing an intelligent agent for designing the assembly strategy for the wind generator hub and the algorithm for the optimal task sequence are described. This reconfigurable automation runs a Partial Order Planning algorithm in real-time using Beckhoff TwinCAT? 3.
Reconfigurable assembly Intelligent agent Partial order planning Wind turbine Beckhoff TwinCAT? 3
C. Deters H. A. Wurdemann Jian S. Dai L. D. Seneviratne K. Althoefer
School of Natural and Mathematical Sciences, Centre for Robotics Research,Strand, London WC2R 2LS, UK
国际会议
天津
英文
95-103
2012-07-08(万方平台首次上网日期,不代表论文的发表时间)