会议专题

An optimization model for flexible routing based flowshop scheduling problem

The complication of quartz process leads to the difficulty of its production scheduling. This paper models the scheduling in quartz production as a flexible routing based flowshop scheduling problem with two objectives. Each job may have one or more process routes, i.e., a job operation may choose one equipment or skilled worker among a set of qualified ones with same function but perhaps with different processing speed or costs. The proposed model is a mixed-integer program: processing costs and tardiness charges. A dedicated Genetic Algorithm is designed with heuristics mechanism to solve the model. The simulated computation shows that the proposed model and the algorithm are feasible and effective for the flexible routing based flowshop scheduling problem.

Production Scheduling Hybrid Flowshop Genetic Algorithm

Qing Wang Fan Wang Shu-an Liu Yanhui Qi

Information science and engineering college, Northeastern university, Shenyang 110004 Liaoning Huihua Automobile Group

国际会议

The 24th Chinese Control and Decision Conference (第24届中国控制与决策学术年会 2012 CCDC)

太原

英文

1996-2001

2012-05-23(万方平台首次上网日期,不代表论文的发表时间)