Nowadays, the difference between peak and lowest of load in electricity market is increasing. Central command requires the power plant to complete the load demand quickly. For this situation, we use particle swarm optimization to solve load economic distribution. We change the weight between speed and economy within the plant, taking into account the auxiliary running. Make the power plant keep up with the central command and keep the unit running at lower coal consumption. Tests show that: Our algorithm is stable and reliable. And we have developed thermal power plant load distribution software, which has been put into commercial operation.

Optimal Load distribution Particle Swarm Optimization Mathematical Model Engineering Realization.

Huang yu Han pu Zhao yun Li yong-ling Wang dong-feng

Hebei Engineering Research Center of Simulation Optimized Control for Power Generation,North China E Hebei Engineering Research Center of Simulation Optimized Control for Power Generation, North China

国际会议

The 24th Chinese Control and Decision Conference (第24届中国控制与决策学术年会 2012 CCDC)

太原

英文

2002-2007

2012-05-23(万方平台首次上网日期,不代表论文的发表时间)