会议专题

Bored Pile With Pile-End Pressure Grouting Technology and Supporting Capacity Analysis

Bored Pile with pile-end pressure grouting technology has been widely used in high-rise buildings and large public buildings in Chinas Inner Mongolia region. Due to this bored pile take a osmosis、filled、 replacement、consolidation and consolidation effect, it could have a special role on eliminating the dregs at the pile bottom and the holes hidden trouble between the pile soil and it also enhance the strength of the pile body, increasing the binding power of pile and the soil between the piles. With the result of that, the supporting capacity has a significantly improved and this technology has become the advanced scientific method of reducing the settlement of the pile foundation. By using a highrise building projects pile example that takes bored piles with pile-end pressure grouting and static loading test, observations and determine the settlement value of the single vertical design capacity analysis methods, it shows that the pile-end pressure grouting bored piles, the layer of sand mixed capacity has been significantly improved.

Bored pile Pile-end pressure grouting Static loading test Carrying capacity

Yuqin Feng Lu zhang Yinghao Wang

The school of Architecture and Civil Engineering, Inner Mongolia University of Science & Technology, Baotou, China

国际会议

2012 International Conference on Electric Technology and Civil Engineering(2012 电子技术与土木工程国际会议 ICETCE 2012)

三峡

英文

41-44

2012-05-18(万方平台首次上网日期,不代表论文的发表时间)