会议专题

Construction Risk Assessment and Countermeasures about the First Phase of Qingdao Rail Transit

Rail transit construction is an important method to improve the traffic supply level and solve the urban transportation problem. Due to the uncertainty of hydrogeologic conditions and the complexity of the construction environment, many risks exist in the construction process. This paper is based on the fundamental theory of risk assessment. After establishing the risk structure model, calculating the weight of risk, and getting risk factors evaluation index through fuzzy estimation, we finally work out targeted strategies of the risk, which has strong and actual application value.

rail transit analytic hierarchy process risk assessment risk countermeasure

Linlin Sun Chunan You Jianxin Liu

College of Civil Engineering and Architecture, Shandong University of Science and Technology Shandon College of Information Science and Engineering, Shandong University of Science and Technology, Shand

国际会议

2012 International Conference on Electric Technology and Civil Engineering(2012 电子技术与土木工程国际会议 ICETCE 2012)

三峡

英文

72-75

2012-05-18(万方平台首次上网日期,不代表论文的发表时间)