会议专题

High Overhung Dangerous Rock And Its Processing Measures By Calculating The Stability

High overhung overhung dangerous rock in the high slope, potential high, development group structure surface, and harm big.How to determine the accurate this kind of dangerous rock failure mode? On the management of dangerous rock is very important. This article through the case study of dangerous rock W1, according to every possible destruction structure surface by calculating the stability, and then take the most unfavorable structure by calculating the results as the dangerous rock treatment failure mode design, again to design schemes are by calculating, practice proves that the method is accurate and reliable by calculating.

Dangerous rock stability Working conditions Prestressed anchor cable Pick beam By calculating.

Jin Xiao

Sichuan College Of Architectural Technologe,Deyang,China,618000

国际会议

2012 International Conference on Electric Technology and Civil Engineering(2012 电子技术与土木工程国际会议 ICETCE 2012)

三峡

英文

173-177

2012-05-18(万方平台首次上网日期,不代表论文的发表时间)