Multi-Level Fuzzy Comprehensive Post-Evaluation of Civil Engineering Projects Based on Entropy Weight
the article focuses on the construction process postevaluation of Tianjin Metro Line 1. Experts questionnaires and practical surveys were used to obtain the original data. The weight of evaluation indicators in the model were determined by Entropy Weight Coefficient method, and the post-evaluation system was established for Tianjin Metro Line 1. The final results show that the construction process of this project is relatively advanced, and this method is effective and feasible in engineering practice.
Entropy Multi-level Fuzzy Subway Construction Process Post-evaluation
CAOYi LIU Bo YUHuan
College of Civil Engineering, Hebei University of Technology, Tianjin, China Civil Engineering Technology Research Center of Hebei Province, Tianjin, China