会议专题

Design of Yunnan Power Grid High-Voltage Transmission Line Automatic Tour Inspection Robot

High-voltage transmission line is an important part of the power system. The important geographic location of Yunnan and the large-scale construction of Yunnan power grid UHV transmission line make the tour inspection and maintenance of UHV transmission line become an urgent problem to be solved. Application of tour inspection robot on high-voltage overhead transmission line can not only reduce the intensity and costs of transmission line inspection, but also improve the quality of tour inspection operation and management. Considering the domestic and overseas research cases, as well as the geographical characteristics of Yunnan and actual situation of the Yunnan power grid, a suitable designation project of high-voltage transmission line automatic tour inspection robot system is presented in this paper.

high-voltage transmission line transmission line tour inspection automatic tour inspection robot

Lu Ling Feng ZhengHua

Electrical Engineering and Renewable Energy School, China Three Gorges University,Yichang, Hubei, China, 443002

国际会议

2012 International Conference on Electric Technology and Civil Engineering(2012 电子技术与土木工程国际会议 ICETCE 2012)

三峡

英文

1483-1486

2012-05-18(万方平台首次上网日期,不代表论文的发表时间)