Optimization Analysis on Schemes of Removing Temporary Supports to Large-span Umbrella-shaped Steel Structural Truss in Taiyuan South Station

Along with the improvement of science technology and the development of steel structure industry, the research on the technology of steel structure construction has become a very important issue. Removing temporary supports is a key point of largespan steel structure, is a process from installed state to design state of the main structure. In this paper, the large-span umbrella-shaped steel structure truss in Taiyuan south station is irfain study object, simulate the process of removing temporary supports by using finite element analysis software MIDAS, by comparing three different schemes of removing temporary supports to large-span truss structures, reach the best scheme.

umbrella-shaped steel structure truss removing temporary supports

Liang Gao Honggang Lei

College of Architecture and Civil Engineering Taiyuan university of technology Taiyuan,China

国际会议

2012 International Conference on Electric Technology and Civil Engineering(2012 电子技术与土木工程国际会议 ICETCE 2012)

三峡

英文

1675-1678

2012-05-18(万方平台首次上网日期,不代表论文的发表时间)