Research on Three-dimension Visual Simulation of Concrete Face Rockfill Dam Construction Process

Concrete face rockfill dam (CFRD) is widely used in hydropower construction. There are many certainty and uncertainty factors involved in its construction process. Hence, computer simulation technology was applied to study it. Based on the analysis of CFRD construction system, firstly the system was divided into three sub-systems: material allocating, transporting and dam filling to establish the simulation system. Secondly the earth-rocks were allocated according to dam construction schedule. Then the allocation results were applied in transporting system and dam filling system to simulate the construction process, from which the duration, road intensity, machine configuration and utilization were obtained, which can be demonstrated by tables and graphics. Finally, simulation results were illustrated by three-dimensional (3D) visual technology.

CFRD construction visualization simulation three-dimension

Hu Chao Zhao Chunju Zhou Yihong Wang Chunyu

College of Hydraulic and Environmental China Three Gorges University Yi Chang, Hubei, China

国际会议

2012 International Conference on Electric Technology and Civil Engineering(2012 电子技术与土木工程国际会议 ICETCE 2012)

三峡

英文

1795-1798

2012-05-18(万方平台首次上网日期,不代表论文的发表时间)