Comparison on Dam Risk Consequences Comprehensive Evaluation Model

Many evaluation factors are involved in dam risk consequences comprehensive evaluation, which exist plenty of uncertainty and correlation between each other. Combined the five methods, such as linear weighted sum method, fuzzy mathematics method, matter element method, gray correlation method and principal component method with dam risk consequences comprehensive evaluation, establishing five dam risk comprehensive evaluation models, applying to the level evaluation of Changlong Reservoir, Xialan Reservoir, Shibikeng Reservoir, Longshan Reservoir, Lingtan Reservoir successfully. Based on this, in terms of evaluating methods, evaluating key technology, evaluating basic steps, weight determination methods, evaluation conclusions meaning and using difficulty, etc, dam risk comprehensive evaluation models are compared comprehensively. Finally these five reservoirs are divided into three types, and dam risk consequences evaluation model based on linear weighted sum method is recommend first.

Dam Risk Consequences Linear Weighted Sum Method Fuzzy Mathematics Method Matter Element Method Gray Correlation Method Principal Component Method Model

Weiwei Sun Haoyao Zheng Lei Li

Dam Safety Management Department Nanjing Hydraulic Research Institute, NHRI Nanjing, China

国际会议

2012 International Conference on Electric Technology and Civil Engineering(2012 电子技术与土木工程国际会议 ICETCE 2012)

三峡

英文

2243-2246

2012-05-18(万方平台首次上网日期,不代表论文的发表时间)