会议专题

Risk Analysis of Foundation Pit with Small Sample Datum Based on Bootstrap Method

The computation cost and the limitedgeotechnical drill information are two difficulties often encountered during a probability based analysis of foundation pit. A new response surface (RS) method and the bootstrap simulation (BS) method are introduced to overcome these problems. The input parameters for constructing the RS are firstly prepared through uniform design (UD) and after obtaining the outputs through finite element method (FEM), the inputs and outputs are regressed through a iton-parameter regression (NPR) to achieve RS, Then, based on the RS, the BS is carried out directly basing on the samples provided by drill datum. A practical engineering is analyzed. The results show that RS together with BS provide a useful analysis tool for risk analysis of foundation pit directly using field drill information instead of using hypthetical probability distributions.

instead of using hypothetical probability distributions. bootstrap response surface small sample foundation pit

Hongwei Zheng Zhigang Song Jing Cao

Faculty of Civil Engineering Kunming University of Science and Technology Kunming, China

国际会议

2012 International Conference on Electric Technology and Civil Engineering(2012 电子技术与土木工程国际会议 ICETCE 2012)

三峡

英文

2649-2652

2012-05-18(万方平台首次上网日期,不代表论文的发表时间)