Simulation analysis of Shallow Buried Multi-arch Tunnel in Construction Process

The multi-arch tunnel is always applied to the highgrade road construction in the mountain area where is suffered from multi-influences of terrain, geological conditions, industry city condition, and road guidelines of even, vertical, and horizontal both in a respective and an interactive way. With the merits of streamline, high space utilization ratio, low room taking, convenient connection with lines outside of hole, and environmental protection, the multi-arch tunnel has been used widely in the road construction.The paper analyzed the design, construction scheme and working procedure of shallow buried large span multi-arch tunnel, which settle a good foundation for appropriate designing, monitoring, early warning, appreciating and emergency treating.

Multi-arch-tunnel Construction project Construction process Numerical simulation Analyze

Wang Yubiao

Shanxi Provincial Communications Planning Surveying & Design Institute TaiYuan,China

国际会议

2012 International Conference on Electric Technology and Civil Engineering(2012 电子技术与土木工程国际会议 ICETCE 2012)

三峡

英文

2657-2659

2012-05-18(万方平台首次上网日期,不代表论文的发表时间)