Steel Production Factory Converter Pile-raft Foundation Analysis and Design

Base on the project of steel production factory converters pile-raft foundations design, the pile-raft foundations average settlement, differential settlement, axial force of pile, stress of raft and so on have been analyzed through this method, that is Poulos theory counting pile-soil stiffness and Reissner thick plank calculating raft. Through the result of program, the plank thickness and pile amount have been optimized for this project. Raft thickness change 3 m to 2.3 m and six piles have been saved. On the condition of satisfaction the regulation of Chinese pile code, it has been economized 18.36% of the project total cost. This steel production factory converter has been successfully and safely put into production, optimizing design get good economic benefit.

pile foundation converter Poulos solution optimizing design

Zhaowu Shen Gaofeng Zhang Qingfang Zhang

School of Civil Engineering Shijiazhuang Tiedao university Shijiazhuang, China Structure design department Hebei Yulong Civil Engineering Limited Incorporation Shijiazhuang, China

国际会议

2012 International Conference on Electric Technology and Civil Engineering(2012 电子技术与土木工程国际会议 ICETCE 2012)

三峡

英文

2682-2686

2012-05-18(万方平台首次上网日期,不代表论文的发表时间)