会议专题

Deliberations on Management of Peer Review of Preliminary Design for Retaining and Protection of Foundation Pit Excavation in Guangzhou

Peer review of preliminary design for retaining and protection of foundation pit excavation, which is an active compliance control measure for design quality, presents a kind of cooperation of clients, designer, independent experts and government functional department Both engineering technical compromising and government supervision are carried out by review managed by government functional department. The review is a course of engineering accreditation activities by government functional department under help of independent experts establishing a peer group as a board of review. New situations and manipulation mistakes or measure faults appear constantly to form new boundary condition which becomes new initiative condition for further construction progress. On a construction process, unpredictable interference and disturbance keeps occurring to increase complexity of production and supervision, therefore it is hard to create a standard routine for a serial actions of engineering accreditation by government The review can be seen as a measure out of Fragmentary management methods. Fault tolerant mechanism preventing situation from deteriorating deserves maintained within the review procedure. Independent experts judgment and assessment is conformed by government functional department but the government functional department has the last say on the accreditation conclusion. To guarantee efficiency of the review the technical officials of government functional department who manage the review should have fair engineering background and policy awareness to ensure the review to go along the right path.

foundation pit compliance control peer review fragmentary management

Jianye Zheng Zhifu Hu

The Office of Guangzhou Construction Science and Technology Committee Guangzhou, China

国际会议

2012 International Conference on Electric Technology and Civil Engineering(2012 电子技术与土木工程国际会议 ICETCE 2012)

三峡

英文

3076-3079

2012-05-18(万方平台首次上网日期,不代表论文的发表时间)