Uncontrolled, unreasonable foundation pit dewatering is often the primary cause of deformation of nearby buildings. It is therefore imperative to diminish or eliminate the negative influence during dewatering. This paper describes the application of artificial recharge to rectify adjacent building deformation due to pumping. Bases on the principle of potential function superposition, a water line equation with pumping and injection wells steady or unsteady simulations operate in a confined aquifer are deduced, thereby an influence radius concept for unsteady flow is proposed. Through a project example, the control effect of recharge for nearby building deformation due to pumping is evaluated, results of which confirms that recharge can be used as an effective management methods. Moreover, some suggestions about the layout of recharge wells are put forward.

artificial recharge defromation control dewatering influence radius well group

Hua Yuan Haitao Wan

School of Civil Engineering and Architecture Henan University Kaifeng, China

国际会议

2012 International Conference on Electric Technology and Civil Engineering(2012 电子技术与土木工程国际会议 ICETCE 2012)

三峡

英文

3711-3714

2012-05-18(万方平台首次上网日期,不代表论文的发表时间)