会议专题

Study of the Scheduling Rules of Short-term Power Generation Dispatching for Single Hydropower Station

Short-term optimal operation of hydropower station is a high-dimensional,multi-constraint and complex system problem. In this paper,Liyuan hydropower station located in the middle reaches of Jinsha River is cited as an example,and the mathematical model of optimal power generation dispatching has been established. We obtain a large amount of optimal scheduling processes by using the progressive optimality algorithm (POA). Then,the corresponding scheduling rules for single hydropower station which can take advantage of runoff prediction results are derived. A case indicates that the scheduling rules can be effectively used to guide the actual operation run of Liyuan hydropower station.

Hydropower station short-time power generation dispatching POA algorithm scheduling rules

Changming Ji Wei Xie Zijun Yang Xiaoxing Zhang Xinliang Zhu

The New and Renewable Energy of Beijing Key Laboratory,North China Electric Power University Beijing Hydrochina Kunming Engineering Corporation,Yunnan Kunming,P. R. China Jinsha River Hydropower,Yunnan Kunming,P. R. China Hunan Dong Jiang Hydroelectric Power Station Zixing,Hunan Province,P. R. China

国际会议

2011 International Conference on Opto-Electronics Engineering and Information Science(2011光电电子工程与信息科学国际会议 ICOEIS 2011)

西安

英文

997-1001

2011-12-23(万方平台首次上网日期,不代表论文的发表时间)