会议专题

The New Three-dimensional Structure of Long Grounding Rod for Large-scale Substation

Slanting Grounding Rod is a new three-dimensional structure of long grounding rod.In the paper it has been in-depth analysis from both effect of resistance reduction and design programs.Different from conventional Vertical Grounding Rod, there is an angle between grounding rod and grounds vertical direction.Therefore effectively solve the problem that both effect and cost of resistance reduction are not satisfied when conventional Vertical Grounding Rod is used in the soil of deep soil resistivity higher than surface soil resistivity.By numerical simulation, consider uniform soil, effect of resistance reduction of Slanting Grounding Rod is about 1.3 times as that of the same length Vertical Grounding Rod.Consider the double-layer soil of deep soil resistivity higher than surface soil resistivity, effect of resistance reduction of Slanting Grounding Rod is about 2 to 8 times as that of the same 60 m Vertical Grounding Rod.For large grounding grid, the time is higher.Installing Slanting Grounding Rod in the double-layer soil, the optimal angle design principle is that parts of Slanting Grounding Rod buried in the low resistance soil are as much as possible.

Slanting Grounding Rod double-layer soil new three-dimensional structure optimal angle deep soil resistivity reflection coefficient resistance reduction

Fangyuan Yang Sen Wang Zhizhong Li Bo Zhang Rong Zeng

Department of Electrical Engineering,Tsinghua University, BeiJing, China Department of High Voltage Shaanxi Electric Power Research Institute, Shanxi Province, China Department of Electrical Engineering, Tsinghua University, BeiJing, China

国际会议

第七届亚太防雷国际会议

成都

英文

1-5

2011-11-01(万方平台首次上网日期,不代表论文的发表时间)