Research on Recovery Voltage from Circuit Breaker Cutting off Various Transformer Faults

When a circuit breaker cuts off a transformers different fault types, there will be different voltage recovery processes. Studying on these transient processes provides bases for the section of breaker and the extraction of fault feature. Based on theoretical analysis and simple calculation, this paper uses PSCAD/EMTDC software to model and emulates every fault system. The results show that when a transformer takes place two-phase grounding fault, the peak of recovery voltage between circuit breakers both ends is highest. A conclusion is drawn that when to choose a breaker, pay attention to the two-phase grounding fault.

Fault Transformer PSCAD Breaker Recovery voltage

Wenhua Xia Maofa Gong Zheng Gong Guoliang Li Xinyuan Xu Jiangbo Wu

Shandong University of Science and Technology Qingdao, Shandong Province, China

国际会议

2011 3nd International Conference on Mechanical and Electronics Engineering(2011年第三届机械与电子工程国际会议 ICMEE2011)

合肥

英文

3204-3207

2011-09-23(万方平台首次上网日期,不代表论文的发表时间)