Application of HHM in Risk Identification of Tunnel Project
Tunnel project contains complex and diverse risk factors. Risk management has an important role on tunneling engineering projects. Risk management is based on risk identification. Only with sufficient knowledge of risk can we analyze,evaluate and control the risk .Traditional risk identification methods are generally targeted at a certain stage of the tunnel project or a particular content of the tunnel project. It can not consider all factors of the tunnel projects. This paper presents a new risk identification method - hierarchical holographic modeling. The method provides a multi-angle decomposition to the perspective of the tunnel features and in order to find the tunnel project risk source. It can provide a basis for risk management.
Hierarchical holographic modeling risk factor risk identification.tunneling engineering
SONG Ti WEI Lianyu SUN Wenxia Sun Wenfeng
College of Civil Engineering, Hebei University of Technology, Tianjin, 300401 Civil Engineering Tech College of Civil Engineering, Hebei University of Technology, Tianjin, 300401 School of science and infomation, Qingdao Agricultural University.Qingdao China
国际会议
合肥
英文
3447-3450
2011-09-23(万方平台首次上网日期,不代表论文的发表时间)