会议专题

Study on the Road Speed Limit Value of Expressway Reconstruction and Expansion

Introduced and analyzed the related factors which influence the running speed in the construction section during the expressway reconstruction and expansion, such as the saturation of construction section, Lane width and the road shoulder width, pavement condition, composition of motorcycle type, type of segregation facility and other safety factors. Associating these main influence factors with the reduction factors of vehicle speed, calculating the corresponding weight of each factor by using AHP, and then the comprehensive speed limit value would be obtained. By comparing the obtained result with the minimal speed limit value influenced by other safety factors, the minimum speed limit value would be chose between them as the reference value. Finally the speed limit value was analyzed by putting the expressway reconstruction and expansion project from Beijing to Hong Kong and Macau (G4) as an example.

expressway reconstruction and expansion speed limit value weighting

Lv Hua-bing Zhu Shun-ying Wang Hong Hu Yan-jie

School of Transportation Wuhan University of Technology Wuhan, China CCCC Second Highway Consultants Co, Ltd, Wuhan, China

国际会议

2011 6th Joint International Information Technology and Artificial Intelligence Conference(2011年第六届IEEE联合国际信息技术与人工智能会议 IEEE ITAIC 2011)

重庆

英文

848-851

2011-08-20(万方平台首次上网日期,不代表论文的发表时间)