Implementing a Device DTM and Integrating into FDUIA for Verification
FDUIA tries to provide a uniform platform to integrate field devices and present migration paths to integrate EDDL and FDT. A DTM integration case was used to verify the feasibility of FDUIA. Some mandatory interfaces and implementing process are illustrated in detail. A Device DTM and FDUIA prototype host application are developed accordingly. Finally the DTM is integrated into FDUIA. It can be integrated into FDUIA and operates well.
FDUIA Device DTM FDT Verification
Zhang Yu Pan Dongbo Liu Feng
School of Computer and Information Science Southwest University of China
国际会议
海口
英文
479-483
2011-07-15(万方平台首次上网日期,不代表论文的发表时间)