Practice and Thoughts on the Submerged Dike Project for Adjusting and Controlling Function in Lower Reach of the Yangtze River
This paper briefly introduces the process of construction and operation conditions about submerged plastic-pillow dam in left branch at Hechang island of Zhenyang reach in Yangtze River. The experience and lessons of practice was summarized systematically about submerged dam. Innovation about the darn was analyzed in detail to control the river regime in branched river of the middle and lower reaches of the Yangtze River.
Hechang island submerged dam diversion ratio
Wang Meifang Zhang Zengfa Dou Zhen
Zhenjiang Municipal Water Resources Bureau,212003,Jiangsu China Yangtze River Water-Course Administration Office of Zhenjiang, 212003,Jiangsu China
国际会议
The Fourth Yangtze Forum(第四届长江论坛)
南京
英文
307-316
2011-04-18(万方平台首次上网日期,不代表论文的发表时间)