Resource Scheduling Algorithm of Space Objects Surveillance for Collision Warning
Space objects surveillance for collision warning is a constraint satisfaction scheduling problem of multiple targets measurement. This paper summarizes the various factors in the scheduling process and proposes the mathematical model of non-cooperative measurement resource scheduling system. The heuristic scheduling algorithms and fuzzy evaluation method is applied to non-cooperative resource scheduling and achieve effective scheduling result.
SpaceObjects CollisionWarning Resource Scheduling
Li Bo Li Daqi
Beijing Aerospace Control Center, Beijing 100094, China
国际会议
三亚
英文
736-739
2012-01-06(万方平台首次上网日期,不代表论文的发表时间)