Numerical analysis of grouting and blocking of Deep large section shaft at working face
To estimate the effect of deep large section Shaft Face Grouting for water block, the mathematical model is obtained according to the seepage theory. The numerical model for calculation is established by the program ABAQUS. The laws of change of pore water pressure, the effect area of dewatering, the velocity of seepage, water inflow of shaft working face before and after grouting is obtained by numerical simulation. It is shown that the grouting can effectively plug water channel of cracked surrounding rock, and prevent the pore water pressure lowering range to be larger. The working face seepage flow velocity was significantly reduced. The water inflow is decreased significantly. The safety of the shaft construction and the stability structure of shaft lining and upper strata are ensured by grouting. The numbers of grout stop and grouting construction can be largely reduced. The economic benefit is obvious. The scientific reference is provided for deep large section Shaft Face Grouting for water block.
Deep well Large section grouting numerical simulation
ZHU Jirning Zhang Wenquan Yu Hailing Liu Xianglan
College of Resources and Environmental Engineering, Shandong University of Science and Technology, N Dept. of Electric Engineering, Zaozhuang Vocational College of Science & Technology College,Teng zho
国际会议
2011 International Conference on Mechatronics and Applied Mechanics(2011年机电一体化与应用力学国际会议 ICMAM 2011)
香港
英文
865-869
2011-12-27(万方平台首次上网日期,不代表论文的发表时间)