会议专题

Study on the Comprehensive Risk Assessment of Offshore Project Based on BP Neural Networks

Due to the following characteristics of offshore program, such as one-time large-scale investment, comprehensive high-risk, long payback period, high uncertainty, high regional and political, the investors has been paid more and more attentions to the risk of offshore program. Combined with the characteristics of offshore program risk management, and with the use of BP neural network theory, this paper constructed the Offshore Program Risk Comprehensive Assessment index system and Assessment Model. Combined with BP network learning process, and on the basis of selecting risk-related parameters and setting different network training layers, this paper simulated the BP model and analyzed the results.

Offshore Program BP neural network Risk assessment

YANG Jia-ning CHEN Wei KANG Xin

School of Economics and Management, Harbin Engineering University, P.R.China, 150001

国际会议

2011 China Located International Conference on Information Systems for Crisis Response and Management(第五届危机响应与管理信息系统中国区国际大会 ISCRAM-China 2011)

哈尔滨

英文

277-284

2011-11-24(万方平台首次上网日期,不代表论文的发表时间)