会议专题

The Risk Monitoring of Coal Construction Project Based on System Dynamics Model

The construction project of coal mine is characterized by onetime, high cost, long duration, difficult construction, technical complexity and multitudinous project participants, whose risk events occur frequently in its construction. Therefore, the risk monitoring of construction project of coal mine is of theoretical significance and practical value. The risk control problems of coal mine construction project were studied from two aspects in the paper: First of all, the organizational framework and process of risk monitoring about coal mine construction project are built; Secondly, the issues about the risk monitoring of construction project of coal mine are dynamically and quantitatively researched through the establishment of system dynamics model.

System Dynamics Coal Risk Monitoring

Ning Yun-cai Mao Yu-yan

Management Dept, China University of Mining and Technology (Beijing), P.R.China

国际会议

2011 China Located International Conference on Information Systems for Crisis Response and Management(第五届危机响应与管理信息系统中国区国际大会 ISCRAM-China 2011)

哈尔滨

英文

332-336

2011-11-24(万方平台首次上网日期,不代表论文的发表时间)