会议专题

Middle route of South-to-North Water Transfer Project in Beijing section of operation risk identification research

In this paper, preliminary built and put into operation in the middle route of South-to-North Water Transfer Project in Beijing section as an example, the use of project risk management theory, through the risk identification method after comparison and analysis, put forward the risk stage identification method. In the use of expert investigation, Delphi method to the risk identification, the system is decomposed into several subsystems, using failure mode effect analysis principle, further identify the system failure mode, failure, failure parts, so that each subsystem risk factors, and finally summarized the Mid-route of South-to-North Water Transfer Project of Beijing section engineering risk recognition framework.

the South-North Water Transfer Project in section of Beijing Operation period System decomposition Failure mode analysis Risk identification

Fan Bo Wang Ye Huang Jun

Graduate University of Chinese Academy of Sciences, College of Engineering, Beijing, China Graduate University of Chinese Academy of Sciences, Emergency Management Research Center Graduate University of Chinese Academy of Sciences, College of Engineering, Beijing, China Graduate

国际会议

International Symposium on Emergency Management 2011(ISEM‘2011)(第六届国际应急管理论坛暨中国(双法)应急管理专业委员会第七届年会)

北京

英文

550-553

2011-11-19(万方平台首次上网日期,不代表论文的发表时间)