Cause Analysis of General Overturn of Port Fixed Crane

According to serious accident of general overturn and machine damage that happens while an enterprise steel wharfs port fixed crane with a rated capacity of 10 t was hoisting load. Checking the safety device and safety structure of key part of the accident crane, and the adaptability of maximum amplitude rated capacity and other cause of the accident, finally put forward safety measure of integrated management of cranes.

Accident Checking Analysis

G.Q.Chen

Ningbo Dahongying University, Ningbo.PR.China