会议专题

PERMIT PROCESS FOR GEOTHERMAL DEVELOPMENT IN ICELAND

Geothermal energy is one of the most important energy sources in Iceland. For new projects it is essential to know well the permit processes required for the development of the energy resources. An act on Environmental Impact Assessment (EIA) was implemented in Iceland in 1994. Thermal power installations larger then 10 MWth are always subjects to EIA and drilling in low temperature areas in the vicinity of hot springs and 10 km long pipelines outside of urban areas may be subject to EIA. Beside this the development has to be in accordance with the master plan of the locality. Other licences or permits are needed before the development of the resources. All of the permit processes can take considerable time and therefore it is necessary to take it into consideration in the early states of planning. These formal processes open for other views and angles which can lead to better projects.

Einar Gunnlaugsson

Orkuveita Reykjavikur Baejarhals 1 110 Reykjavik ICELAND

国际会议

Workshop for Decision Makers on Direct Heating Use of Geothermal Resources in Asia(亚洲地热资源直接利用国际研讨会)

天津

英文

458-467

2008-05-11(万方平台首次上网日期,不代表论文的发表时间)